Sage & Marble | 5 Room HDB Renovation | Luna Studio
Open concept kitchen with sage green cabinets and stainless steel appliances in a reworked 5 room HDB.
The Plan, Reworked

Sage & Marble

A 5 room HDB reworked through spatial reconfiguration, integrated storage and a controlled material language within the realities of the existing home.

The project combined substantial reconfiguration with detailed joinery, wet area works, service coordination and a documented construction programme.

Property5 Room HDB
LocationBukit Batok, Singapore
Area1275 sq ft
Initial ContractS$84,000
Documented Variations2
Variation Value+S$9,000
Documented ValueS$93,000
Programme to Handover13 weeks
ScopeInterior Design and Renovation
The Brief

The home had to change before the style could work.

The starting point was an existing 5 room HDB whose internal relationships needed to be reconsidered. The project reworked room functions, circulation and storage while developing a stronger material identity across the home.

The objective was not simply to restyle the existing rooms. The plan itself had to do more work.

The Constraints

The existing home set the rules.

Selected partitions could be reconsidered, but the existing reinforced concrete structure could not simply be altered. Proposed demolition also depended on on site verification and specific HDB conditions.

Wet area work carried its own requirements around waterproofing, floor build up and existing services. One proposed kitchen configuration was also not allowed because the resulting route through the kitchen would compromise the required direct escape path.

The design therefore had to find the maximum useful change, not the maximum possible demolition.

The Design Question

How do you create a more connected home without ignoring the rules of the home that already exists?

Space Planning

The plan, reworked.

The spatial strategy began with the existing HDB framework rather than the finished aesthetic. Selected partitions were removed or repositioned, room functions were reconsidered, and the furniture plan was then used to test how the revised arrangement would work in everyday use.

Original layout plan of the 5 room HDB showing the existing internal boundaries.
Existing plan — establishing which boundaries could be reconsidered and which elements had to remain.
Proposed furniture and space planning layout showing the revised room relationships.
Proposed plan — reorganising circulation and room relationships within the existing framework.
Key Spatial Move

Making more room without adding any.

An existing store zone was reconfigured toward a bedroom and walk in wardrobe arrangement, increasing the functional capacity of the plan without increasing the footprint.

The value was not simply the additional room. The surrounding circulation and doorway relationships also had to be reconsidered so the new space worked as part of the wider plan.

Open concept kitchen with sage green cabinets showing the adjusted boundary to the living space.
The kitchen opens toward the shared space, with the boundary adjusted rather than removed.
Kitchen Integration

Open where it should be open.

The kitchen was intended to participate more strongly in the shared living space, but openness had to stop where it conflicted with the safety requirements of the home.

The final arrangement therefore treats openness as something to calibrate rather than maximise, removing selected boundaries while retaining the circulation and escape logic required by the home.

Kitchen island with a marble surface and sage green cabinetry.
The island, cabinetry, appliance housing and service points had to resolve as one composition.
From Ambition to Arrangement

Ambition

The kitchen was meant to take part in the shared living space.

Limit

One proposed configuration was not allowed because it compromised the direct escape route.

Response

Selected boundaries were removed while the circulation and escape logic stayed intact.

Joinery and Bedrooms

Storage built into the plan.

Storage was treated as part of the architecture rather than something added after the room was designed.

Full height wardrobes, open display and integrated vanity elements were developed alongside the room configuration so that storage could absorb practical requirements without visually fragmenting the space.

Bedroom with a green accent wall and a custom built in wardrobe.
The bedroom reads as one elevation, with storage built into the architecture rather than placed against it.
Custom open timber wardrobe with integrated display storage.
Continuous cabinetry carries the material language across the room while absorbing practical storage.
Timber TV console with living room decor.
Integrated media and living storage designed directly into the spatial layout.
How Storage Was Distributed

Full Height Wardrobes

Absorb the practical storage requirements of the room.

Open Display

Keeps selected items visible without fragmenting the wall.

Living Storage

Media and display built into the layout rather than freestanding.

Integrated Vanity

Built into the room rather than added to it.

Master bathroom with dark green shower tiles and plant decor.
Master bathroom — dark green shower tiles bring the sage palette into the private suite.
Wet Area Integration

Where the finish depends on what you cannot see.

The bathrooms were designed as strong material spaces, but the finished surfaces depended on a less visible layer of coordination.

Waterproofing, floor build up, drainage, plumbing, wall finishes and glass had to be resolved together before the final surfaces could be installed.

Common bathroom in grey marble with a rainfall shower.
Common bathroom — grey marble here relates the wet area to the stone used in the kitchen.
Resolved Before the Finish

Waterproofing

Sealed before any finish is laid.

Floor Build Up

Set out against existing levels and services.

Plumbing and Drainage

Positioned before walls and floors close up.

Wall Finishes and Glass

Dimensioned so the visible surfaces land cleanly.

Shower with chrome fixtures set against dark tile.
Shower and fixture resolution requiring precision before the wet area surfaces are sealed.
Marble double vanity in the ensuite.
The double vanity reads as part of the joinery language rather than a separate fixture.
Stone bathroom niche with plants and soap.
Functional recesses had to be dimensioned early, before the masonry and finishes closed around them.
Master bedroom suite with an open concept vanity and workspace.
Bedroom, vanity and workspace share one open space, so the materials do the separating that walls do not.
Material Logic

One palette, different roles.

The material palette was not repeated room by room. Each element was given a different job.

Sage

Establishes continuity across built in elements.

Stone

Creates moments of visual weight and connects the kitchen and wet areas.

Timber

Softens the cooler palette and introduces warmth where needed.

The result is one visual language that moves between rooms without making every room identical.

Project Responsibility

What Luna Studio handled.

Spatial Planning

Layout development and spatial reconfiguration.

Design Development

Design development and refinement across the proposed spaces.

Technical Documentation

Construction and joinery information needed to translate the design.

Material Direction

Material selection and specification development.

Project Continuity

Design decisions carried forward into the documented project process.

The design had to survive the site

The information behind the interior.

A finished photograph shows the result. Behind it are drawings, dimensions, service coordination, specifications and site decisions that make the design specific enough to build.

Selected technical drawings

Hacking and demolition floor plan showing the walls to be removed.
Hacking and Demolition Plan — mapping out what changes.
Masonry and wall erection layout plan defining the new partitions.
Masonry and Wall Erection — defining the new partition boundaries.
Plumbing and fixtures layout plan.
Plumbing and Fixtures — coordinating the wet area infrastructure.
Proposed electrical and lighting layout plan.
Electrical and Lighting — coordinating the invisible infrastructure.
Custom kitchen cabinetry elevation drawing.
Kitchen Cabinetry Elevation — specifying the visible joinery.
Master bedroom wardrobe and vanity elevation drawing.
Wardrobe Elevation — detailing the custom storage.
Master bedroom wardrobe and vanity front elevation drawing.
Vanity Elevation — translating the built in detail.
Shower half wall masonry elevation drawings.
Shower Masonry Elevation — resolving the wet area geometry.
View the wider technical set
Kitchen cabinetry mortar base layout plan.
Kitchen Mortar Base — the foundation for the built in kitchen.
False ceiling and bulkhead layout plan.
False Ceiling and Bulkhead — overhead allowances for services.
Electrical power point and data layout plan.
Power Point and Data Layout — locating sockets and data points.
Detailed electrical items floor plan.
Detailed Electrical Items — itemising the electrical scope.
Air conditioning planning and layout drawing.
Air Conditioning Layout — planning equipment and pipe routes.
Custom wardrobe and dresser internal elevation drawing.
Wardrobe Internal Elevation — organising the inside of the storage.
Masonry and tile specification layout.
Masonry and Tile Specification — setting out the wet area finishes.
Vinyl flooring layout and specification plan.
Flooring Specification — defining floor finishes by area.
Painting specification and colour scheme layout.
Painting Specification — recording the colour scheme.
Empty space planning and partition layout.
Empty Space Planning — the base plan before furniture.
Construction Sequence

A renovation is a sequence.

The project was programmed across thirteen site weeks to handover, moving through demolition, service works, tiling, ceilings, flooring, carpentry fabrication, installation, worktops, final fittings, finishing and handover.

The schedule makes the dependencies between trades visible rather than treating renovation as a single undifferentiated phase.

Project Evolution

The scope evolved.

Renovation decisions continued to evolve after the original contract. Two documented variation orders recorded additions and omissions across different parts of the work.

Initial contract, two documented variation orders and documented value
ItemAmount
Initial ContractS$84,000
Variation Order 01+S$4,000
Variation Order 02+S$5,000
Total Documented Variations+S$9,000
Documented ValueS$93,000

Documented value is the initial contract plus the two documented variation orders.

The changes were documented item by item rather than being absorbed into an unexplained final figure.

What the Variations Recorded

Material

Selected material specifications changed during project development.

Function

Additional storage and cabinetry requirements evolved with the project.

Construction

Service related and installation details also required documented adjustment.

The Principle

Real renovation projects evolve. Good documentation keeps the decisions visible.

The Outcome

The home changed in four ways.

Deliberate Room Relationships

The plan was materially reworked instead of simply restyled.

More Functional Capacity

The revised configuration made greater use of the existing footprint.

A Consistent Material Language

Sage, stone and timber relate different rooms without making them identical.

A More Resolved Renovation

The design was carried through planning, documentation, construction sequencing and documented scope evolution.

Chat via WhatsApp
Previous
Previous

966 hougang [ Dark Timber Stone ]

Next
Next

Tampines Green Gem [The Inverted Layout]